PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fixing the main steel column at the Monumental Stairs Facing East (800x600).jpg Continued installing conduit at Stairs -2 Facing South (800x600).jpg Installed duct hangers along column line D Facing South (800x600).jpg Installed metal decking at Stairs -2 (Roof) Facing East (800x600).jpg Installed wire mesh for the slab on grade at the Monumental Stairs Facing East (800x600).jpg
Next page Continued fixing the main steel column at the Monumental Stairs Facing East (800x600)
Continued fixing the main steel column at the Monumental Stairs Facing East (800x600)